Tuesday, March 23, 2010
RTB hearing
The RTB's hearing for Blair House Rehabilitation project took place over a period of three hours.
A reminder, Shindico does not have the right to make us leave prior to our leases being up.
If you or any other tenant feel that Shindico treated you in a way that was unjust, unethical -- or that they misrepresented the truth by sending the letters they did which made it sound like we were obliged to leave -- the RTB wants to know about it.
Contact:
1. Janet Halldorson -- RTB Rehabilitation Officer: 945.1962
2. Darren Cooper -- RTB Manager Client Services -- 945.4435
During the hearing Janet Halldorson did make a point of stating she takes the treatment of tenants during these kinds of projects very seriously, and she wants to hear from tenants regarding their experiences with Shindico on this. Janet said this is relevant even if you have already moved out, or plan to do so.
Another interesting point that came up during the hearing:
The RTB may take as long as two months to reach a decision on this.
In the meantime, it is possible that Shindico may initiate work to the building, but they have absolutely no right (nor did they ever) to force anyone out of their home.
Shindico's proposed *Rehabilitation* of the building is valued at approximately $2.7 million. That's about $67,000 per unit in "upgrades."
Another interesting point came up when one of the tenants attending the hearing revealed she's been in exactly the situation these sorts of *schemes* create. She has had to endure 3 evictions in the past 4 years, because landlords chose to *rehabilitate* her out of her home.
One of the tenants wrote a very strong letter that Janet read during the hearing. The points covered and questions raised were significant, and Janet stated that all these were duly noted and that she will be going over the letter with someone else to make sure the points raised were addressed properly.
A reminder, Shindico does not have the right to make us leave prior to our leases being up.
If you or any other tenant feel that Shindico treated you in a way that was unjust, unethical -- or that they misrepresented the truth by sending the letters they did which made it sound like we were obliged to leave -- the RTB wants to know about it.
Contact:
1. Janet Halldorson -- RTB Rehabilitation Officer: 945.1962
2. Darren Cooper -- RTB Manager Client Services -- 945.4435
During the hearing Janet Halldorson did make a point of stating she takes the treatment of tenants during these kinds of projects very seriously, and she wants to hear from tenants regarding their experiences with Shindico on this. Janet said this is relevant even if you have already moved out, or plan to do so.
Another interesting point that came up during the hearing:
The RTB may take as long as two months to reach a decision on this.
In the meantime, it is possible that Shindico may initiate work to the building, but they have absolutely no right (nor did they ever) to force anyone out of their home.
Shindico's proposed *Rehabilitation* of the building is valued at approximately $2.7 million. That's about $67,000 per unit in "upgrades."
Another interesting point came up when one of the tenants attending the hearing revealed she's been in exactly the situation these sorts of *schemes* create. She has had to endure 3 evictions in the past 4 years, because landlords chose to *rehabilitate* her out of her home.
One of the tenants wrote a very strong letter that Janet read during the hearing. The points covered and questions raised were significant, and Janet stated that all these were duly noted and that she will be going over the letter with someone else to make sure the points raised were addressed properly.
Tuesday, February 16, 2010
Notes on the letter, dates, and RTB...
For anyone who is unclear about the Rehabilitation Scheme, Janet Halldorson at the Residential Tenancies Branch (204) 945-2476 is the Tenant Officer handling the case.
There are several things to note:
- Tenants are allowed stay until the end of their current lease. They are not *required* to vacate by April 30th.
This date is when the landlord would like to move forward with renovations.
- The letter before Feb 25th, is for the COMPENSATION of $600.
You still have a right to stay PAST April 30th, AND should you vacate after that you aren't entitled to the $600 (they are only legally bound to provide up to $350 in the act.)
- If you choose to stay past April 30, but want to leave prior to the end of your lease, you can provide 1 months notice in writing. (Janet has mentioned this... check with her for details if this is something of interest.)
- IF you want to re-lease your suite, you have until you vacate (no matter when) to send a letter in writing stating your interest. This is because they are renovating and asking us to leave.
- The RTB will go through and inspection of the suites again (maybe as soon as this week.) They show the suites and areas with major problems that require renovation. This happened last year, and it was Janet who came around in April, and she approved the rehabilitation order at that time, agreeing that the building needed these renovations.
- There will be an initial hearing (NOT an Appeal, but the first "process hearing") set after the RTB sends out an order letting us know if they've approved the rehab scheme. You can voice your concerns at this hearing or also specify details to be read or brought up via letter to RTB (talk to Janet.)
There are several things to note:
- Tenants are allowed stay until the end of their current lease. They are not *required* to vacate by April 30th.
This date is when the landlord would like to move forward with renovations.
- The letter before Feb 25th, is for the COMPENSATION of $600.
You still have a right to stay PAST April 30th, AND should you vacate after that you aren't entitled to the $600 (they are only legally bound to provide up to $350 in the act.)
- If you choose to stay past April 30, but want to leave prior to the end of your lease, you can provide 1 months notice in writing. (Janet has mentioned this... check with her for details if this is something of interest.)
- IF you want to re-lease your suite, you have until you vacate (no matter when) to send a letter in writing stating your interest. This is because they are renovating and asking us to leave.
- The RTB will go through and inspection of the suites again (maybe as soon as this week.) They show the suites and areas with major problems that require renovation. This happened last year, and it was Janet who came around in April, and she approved the rehabilitation order at that time, agreeing that the building needed these renovations.
- There will be an initial hearing (NOT an Appeal, but the first "process hearing") set after the RTB sends out an order letting us know if they've approved the rehab scheme. You can voice your concerns at this hearing or also specify details to be read or brought up via letter to RTB (talk to Janet.)
Thursday, February 4, 2010
More details on the "Notice to Vacate"
Recently, we all received a very well crafted letter designed to make us believe this Rehab. project is approved and that we need to *act fast* -- in order to take advantage of the *great deal* they're offering us. They want us all to sign off as quickly as possible and prepare to move out into the over.saturated 1% vacancy rate rental market.
Well, the truth is rather different. A number of us have spoken with Janet Halldorson, RTB's Rehabilitation Officer -- and Shindico's application has only just been received (from my conversation with her last Friday, she had yet to look it over). This means there are still various stages and hoops in the process that must be completed prior to Shindico having any official approval to begin this work -- let alone start giving us these type of threatening letters. In fact, tenants must first receive official notice of the application having been submitted to the RTB. This is one of the notices I received last year when they first attempted it, my name and other details were blurred out, but it basically looks like this:
https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEheQsqf9jojDR9PSNcV_ls1NJD4sKeP2Lh5bhgAehb00lXyV2UoSqhYo2uytHvwL6ypgRYtdtB1TwdM7-zSbuGZ-zk9vLBqtWtd4WAHxOWJP6rgexzWyxKkBzGC1a-oW7illOLT37QZ4M6w/s1600-h/notice-3.jpg
Then, we are entitled to examine their documents and challenge the rehabilitation proposal. Janet Halldorson repeatedly stated that from what we told her, the tone of the letter was highly inappropriate, as was the verbal communications some have received from Shindico (i.e. Shindico's Colleen O'Rourke stated that construction crews would enter suites after April and make them uninhabitable, with effectively no clear plan on where the displaced tenants would be moved to. Effectively, Shindico wants all of us to feel very threatened and vulnerable by choosing to stay.)
Incidentally, although Shindico's letter reached us, they didn't bother forwarding it to the RTB -- Janet Halldorson seemed genuinely concerned by what she was hearing about it from us. Now, at least one of the tenants has faxed her a copy of this letter, so she is currently aware of its contents. Having said that, she requested that we fax her our letter so she can examine it and consider what to do next. When Janet was contacted last Friday, she made it clear she was interested in hearing from us and asked we include a cover letter outlining our concerns and if we felt Shindico's tactics were in our opinion "intimidating in nature" (her words).
NOTE: Janet Halldorson's fax number -- 945-6273 and email -- janet.halldorson (at) gov.mb.ca
Given the actual (non) status of their application currently, and Janet Halldorson's reaction, it would appear that Shindico's strategy is to *entice* as many tenants as possible to leave now, in order to lessen any possible challenges or delays in the application approval process. The more tenants who leave now, the easier the approval process will be and the more clout they'll have to say: "Our buiding is x% vacant now, and this means the Rehab project won't be much of an inconvenience to remaining tenants".
In any case, the important thing right now is for EVERYONE in the building to be aware that they need not sign anything for Shindico. We also need to contact Janet Halldorson about this in the letter she's requested. A number of us have been speaking in the halls, and feel it would be helpful to hold a tenants' meeting on this ASAP. Together, we can write up a letter that we can have all tenants sign prior to submitting. This way if any tenant has trouble with getting the letter done for whatever reason, this would allow them to have their voice included and heard.
-=-=-
Brian Grant (Housing Development Coordinator @ West Broadway Development Corporation), has mentioned there is the possibility that legal action could be taken as a precedent setting case, based on this being a human rights issue. We, as tenants do have a right to safe, affordable housing and current legislation/policy is making that less and less of a reality.
According to Brian Grant, the bulk of low to middle-income rental housing stock is currently being lost to condo conversions and rehab projects like this one. The reality is there is NOTHING stopping any of us having to relive a potential displacement from our next home in the event we move to another rental after this. This is the current trend right now.
Well, the truth is rather different. A number of us have spoken with Janet Halldorson, RTB's Rehabilitation Officer -- and Shindico's application has only just been received (from my conversation with her last Friday, she had yet to look it over). This means there are still various stages and hoops in the process that must be completed prior to Shindico having any official approval to begin this work -- let alone start giving us these type of threatening letters. In fact, tenants must first receive official notice of the application having been submitted to the RTB. This is one of the notices I received last year when they first attempted it, my name and other details were blurred out, but it basically looks like this:
https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEheQsqf9jojDR9PSNcV_ls1NJD4sKeP2Lh5bhgAehb00lXyV2UoSqhYo2uytHvwL6ypgRYtdtB1TwdM7-zSbuGZ-zk9vLBqtWtd4WAHxOWJP6rgexzWyxKkBzGC1a-oW7illOLT37QZ4M6w/s1600-h/notice-3.jpg
Then, we are entitled to examine their documents and challenge the rehabilitation proposal. Janet Halldorson repeatedly stated that from what we told her, the tone of the letter was highly inappropriate, as was the verbal communications some have received from Shindico (i.e. Shindico's Colleen O'Rourke stated that construction crews would enter suites after April and make them uninhabitable, with effectively no clear plan on where the displaced tenants would be moved to. Effectively, Shindico wants all of us to feel very threatened and vulnerable by choosing to stay.)
Incidentally, although Shindico's letter reached us, they didn't bother forwarding it to the RTB -- Janet Halldorson seemed genuinely concerned by what she was hearing about it from us. Now, at least one of the tenants has faxed her a copy of this letter, so she is currently aware of its contents. Having said that, she requested that we fax her our letter so she can examine it and consider what to do next. When Janet was contacted last Friday, she made it clear she was interested in hearing from us and asked we include a cover letter outlining our concerns and if we felt Shindico's tactics were in our opinion "intimidating in nature" (her words).
NOTE: Janet Halldorson's fax number -- 945-6273 and email -- janet.halldorson (at) gov.mb.ca
Given the actual (non) status of their application currently, and Janet Halldorson's reaction, it would appear that Shindico's strategy is to *entice* as many tenants as possible to leave now, in order to lessen any possible challenges or delays in the application approval process. The more tenants who leave now, the easier the approval process will be and the more clout they'll have to say: "Our buiding is x% vacant now, and this means the Rehab project won't be much of an inconvenience to remaining tenants".
In any case, the important thing right now is for EVERYONE in the building to be aware that they need not sign anything for Shindico. We also need to contact Janet Halldorson about this in the letter she's requested. A number of us have been speaking in the halls, and feel it would be helpful to hold a tenants' meeting on this ASAP. Together, we can write up a letter that we can have all tenants sign prior to submitting. This way if any tenant has trouble with getting the letter done for whatever reason, this would allow them to have their voice included and heard.
-=-=-
Brian Grant (Housing Development Coordinator @ West Broadway Development Corporation), has mentioned there is the possibility that legal action could be taken as a precedent setting case, based on this being a human rights issue. We, as tenants do have a right to safe, affordable housing and current legislation/policy is making that less and less of a reality.
According to Brian Grant, the bulk of low to middle-income rental housing stock is currently being lost to condo conversions and rehab projects like this one. The reality is there is NOTHING stopping any of us having to relive a potential displacement from our next home in the event we move to another rental after this. This is the current trend right now.
Saturday, January 30, 2010
Notice to Vacate effective April 30, 2010
Hello Blair House tenants,
Just a note to let you know that the notice to vacate does not mean that you *must* break your lease by April 30, 2010. The management company is requesting you to leave, and are offering compensation to move out if you choose to sign the form and agree to break your lease with them and vacate.
Upon examining the documents more closely, there is an impression that one can still choose to stay until the end of the original lease.
Please feel free to comment or email.
Thank you.
Just a note to let you know that the notice to vacate does not mean that you *must* break your lease by April 30, 2010. The management company is requesting you to leave, and are offering compensation to move out if you choose to sign the form and agree to break your lease with them and vacate.
Upon examining the documents more closely, there is an impression that one can still choose to stay until the end of the original lease.
Please feel free to comment or email.
Thank you.
Saturday, July 25, 2009
Reminder: APPEAL HEARING July 28 10:00 AM
For those of you interested, the Rental Increase Appeal hearing will be this Tuesday at the Residential Tenancies Commission
July 28, 2009
10:00am
Residential Tenancies Commission
1650-155 Carlton Street, Winnipeg, MB.
This is downtown on Carlton St next to the Convention Centre.
View Larger Map
During this hearing, the opportunity to present on why the above-the-guideline increase ordered by the RTC should be reversed.
July 28, 2009
10:00am
Residential Tenancies Commission
1650-155 Carlton Street, Winnipeg, MB.
This is downtown on Carlton St next to the Convention Centre.
View Larger Map
During this hearing, the opportunity to present on why the above-the-guideline increase ordered by the RTC should be reversed.
Wednesday, July 15, 2009
Appeal hearing status
If you didn't have a chance to attend the viewing of the documents at the RTC scheduled July 8th this month, but did at the RTB previously, you can be reassured that it was the same set of documents with the addition of:
- 13 letters submitted objecting to the increase (THAT's GREAT!)
- The order given by the RTC with adjustments to the percentage due to Shindico's failure to produce receipts for certain items in their claimed amounts.
- Notices given to all the tenants with the new increase rents.
Not much more information than before.
The hearing is set for July 28th at 10 a.m. at the RTC (1650-155 CARLTON St.)
A few things to note:
1. Remember, the hearing is focused on Shindico's application for the year 2006-2007.
2. It doesn't matter if individual suites weren't improved, or that say" My floor hasn't had a replacement machine but other floors have..." we as tenants have to all collectively pay for the cost of the building improvement as a whole.
3. Supporting documents that any interested party intends to present need to be files 10 days prior to the hearing.
Submit 5 copies to RTC rep David Morais (945-7412).
-=-=-
A few of us did meet with Marianne Cerelli who has been kind enough with her time to offer advice.
If you are interested or intend to appear at the hearing - please don't hesitate to contact 43roslyn (at) gmail.com as we may have information to share that will help at the hearing.
- 13 letters submitted objecting to the increase (THAT's GREAT!)
- The order given by the RTC with adjustments to the percentage due to Shindico's failure to produce receipts for certain items in their claimed amounts.
- Notices given to all the tenants with the new increase rents.
Not much more information than before.
The hearing is set for July 28th at 10 a.m. at the RTC (1650-155 CARLTON St.)
A few things to note:
1. Remember, the hearing is focused on Shindico's application for the year 2006-2007.
2. It doesn't matter if individual suites weren't improved, or that say" My floor hasn't had a replacement machine but other floors have..." we as tenants have to all collectively pay for the cost of the building improvement as a whole.
3. Supporting documents that any interested party intends to present need to be files 10 days prior to the hearing.
Submit 5 copies to RTC rep David Morais (945-7412).
-=-=-
A few of us did meet with Marianne Cerelli who has been kind enough with her time to offer advice.
If you are interested or intend to appear at the hearing - please don't hesitate to contact 43roslyn (at) gmail.com as we may have information to share that will help at the hearing.
Thursday, May 28, 2009
We're not being evicted! (yet)
Lease Renewals for the next 12 months are being delivered. There were approx 9 apartments who were slated to receive a lease renewal (for Sept 1st, 2009.) The owners have not given approval for this project as of yet -- a point confirmed by Shindico's Property Manager Candace Bertie, who also stated the Rehabilitation project has not been *cancelled*, but deferred.
"We were trying to rush it through this year," acknowledged Bertie this afternoon, "but because we'll have more time to get documentation into the RTB now, we hope to let tenants know about it much sooner next year. Hopefully, by early next spring."
What it means for current tenants is that for the time being, there is no scramble to look for a new place to live, but that we could expect a similar scenario (with possibly more official notice) approximately a year from now. Bertie also stated that no major renovations or maintenance are scheduled in the year to come, with the exception of replacing the boiler.
While we can all breathe a collective sigh of relief -- as far as having a place to call home for the next year -- we can still look forward to mounting the appeal of the 8% rent hike that's included on the new lease renewals.
"We were trying to rush it through this year," acknowledged Bertie this afternoon, "but because we'll have more time to get documentation into the RTB now, we hope to let tenants know about it much sooner next year. Hopefully, by early next spring."
What it means for current tenants is that for the time being, there is no scramble to look for a new place to live, but that we could expect a similar scenario (with possibly more official notice) approximately a year from now. Bertie also stated that no major renovations or maintenance are scheduled in the year to come, with the exception of replacing the boiler.
While we can all breathe a collective sigh of relief -- as far as having a place to call home for the next year -- we can still look forward to mounting the appeal of the 8% rent hike that's included on the new lease renewals.
Thursday, May 21, 2009
Back to the rent increase appeal for a moment...
Checked in with the RTB and RTC this morning: there has been no scheduled hearing for the appeal to the above the guideline increase.
The RTC gave me a ball park of July. We should be getting letters with info on the hearing soon.
The RTC gave me a ball park of July. We should be getting letters with info on the hearing soon.
Wednesday, May 20, 2009
CBC coverage
Online published:
http://www.cbc.ca/consumer/story/2009/05/19/mb-rent-increases.html
Also be sure to scroll through some of the comments at the bottom of the article:
http://www.cbc.ca/consumer/story/2009/05/19/mb-rent-increases.html#socialcomments
-=-=-
Radio One:
- CBC interview with Masha Giller May 19, 2009:
Tenants of a Roslyn Road apartment are worried about losing their homes. After battling an above-average rent increase, they are now facing eviction to make way for a building rehabilitation project.
Direct link to mp3 file
- Follow up Interview with Avrom Charach from the CFAA - Canadian Federation of Apartment Associations on May 19, 2009
Direct link to mp3 file
(Or visit this page and scroll to:
"Rent control is supposed to protect tenants. But the lord of all landlords says it's actually serving building owners. Find out why."
- CBC radio interview with Molly McKracken of the West Broadway Development Centre on May 20, 2009: Direct link to mp3 file
-=-=-=-
Items to note:
3 things that the RTB can take into account on above the guideline increase:
- Dishonesty (landlord did not do what they claimed they did on the application)
- Mathematical error (bills provided didn't match what they were trying to claim)
- General failure to maintain the property (new windows, roof, but toilet is always plugged...)
Above the guideline increase does not take into consideration:
- Tenant's financial ability or desire to pay
- Tenant's suggestion that the landlord didn't maintain the way a tenant WANTED to maintain (i.e. I didn't want the new stove - why did you buy it for me?)
With a rehabilitation scheme the RTB can alter the program so that it affects the tenant as little as possible.
http://www.cbc.ca/consumer/story/2009/05/19/mb-rent-increases.html
Also be sure to scroll through some of the comments at the bottom of the article:
http://www.cbc.ca/consumer/story/2009/05/19/mb-rent-increases.html#socialcomments
-=-=-
Radio One:
- CBC interview with Masha Giller May 19, 2009:
Tenants of a Roslyn Road apartment are worried about losing their homes. After battling an above-average rent increase, they are now facing eviction to make way for a building rehabilitation project.
Direct link to mp3 file
- Follow up Interview with Avrom Charach from the CFAA - Canadian Federation of Apartment Associations on May 19, 2009
Direct link to mp3 file
(Or visit this page and scroll to:
"Rent control is supposed to protect tenants. But the lord of all landlords says it's actually serving building owners. Find out why."
- CBC radio interview with Molly McKracken of the West Broadway Development Centre on May 20, 2009: Direct link to mp3 file
-=-=-=-
Items to note:
3 things that the RTB can take into account on above the guideline increase:
- Dishonesty (landlord did not do what they claimed they did on the application)
- Mathematical error (bills provided didn't match what they were trying to claim)
- General failure to maintain the property (new windows, roof, but toilet is always plugged...)
Above the guideline increase does not take into consideration:
- Tenant's financial ability or desire to pay
- Tenant's suggestion that the landlord didn't maintain the way a tenant WANTED to maintain (i.e. I didn't want the new stove - why did you buy it for me?)
With a rehabilitation scheme the RTB can alter the program so that it affects the tenant as little as possible.
Monday, May 18, 2009
CBC Coverage of Blair House Issues: Tuesday, May 19 (Information Radio)
CBC has confirmed they'll be airing the story somewhere between 7:10 and 8:30 Tuesday morning (19 May). They plan to have the interview with one of our tenants here, the director of the RTB, as well as possibly someone from Shindico and/or the Professional Property Manager's Association (these last two are not confirmed). There is the possibility that it *may* get deferred if there's a sudden, late breaking news story.
So, if you're awake in the mornings listen at:
89.3 FM -- CBC's Information Radio, Tuesday morning (7:10 am - 8:30 am)
Also CBC TV's Mychaylo Prystupa may be doing a story on what's happening here. More details will follow.
Monday, May 11, 2009
Termination notices & Rehabilitation Scheme
1. Shindico has begun the application process for what is called a Rehabilitation Scheme. This has not been approved by the Residential Tenancies Branch, but the application has been initially filed (we believe on May 1st.)
2. They have already given notice to three tenants in the building that they will be terminating their leases July 31st. (These tenants were given 90 days notice prior to their lease renewal date.)
Here are scans of the 3-page notice give to one of those tenants.
Click on the image to enlarge:



3. We have been told by property manager, Candace Bertie, that
- Everyone can expect this notice 3 months (90 days) prior to their lease expiring.
- If the application is approved, the proposed period of renovations would being June 1 and carry on until the end of October, November.
- New rents will be approx $850 for a 1 BR $1000 for a 2 BR.
4. Some things you need to know about what can happen after a rehabilitation scheme:
- A tenant who was previously living in a complex before a rehabilitation scheme is technically supposed to have the first chance to move back in. (see the points below...)
- New rents will be beyond scope of rent control for next FIVE years. In other words, you can come back to your apartment @ 850/month and then have it jacked up another 50, 75 or more dollars in subsequent years.
- the WHOLE building is affected, every suite has to have renovations as part of the rehab scheme criteria.
- Shindico may not charge the new rent until ALL renovations are completed and meet up to the expectations of the Residential Tenancies Branch. (There is a final inspection for this, and tenants can delay the new rent process is the renovations/repairs have not met the proposed plan.)
5. The official words from the RTB policies and guidelines:
- Within 14 days of applying for approval of their rehabilitation scheme, the landlord must give the tenants affected by the scheme written notice of their plans. The landlord must also give the tenants a chance to inspect the application and the supporting information.
- If the tenants must move out to allow the landlord to do the work, the landlord must give them a written notice to end the tenancy. The landlord must pay the tenant’s moving expenses up to $350.00.
- Tenants who lived in a residential complex, before the rehabilitation scheme, must be given the first chance to move back in. The landlord must charge the returning tenant the lowest rent they would charge any other tenant for the same unit.
- If a plan is approved, the rental unit(s) or complex can be exempt from the annual rent increase guideline for up to five years. The landlord is still required to give the tenants three months’ notice of any rent increase. The landlord is also required to give a Notice to New Tenant form to any tenant moving into the building.
To set an exemption period, the Branch calculates how much the landlord plans to spend on each unit. The Branch then uses the following scale:
Cost Per Unit Exemption Period
$ 6,000.00 – $7,999.99 - 2 years
$ 8,000.00 – $9,999.99 - 3 years
$10,000.00 – $11,999.99 - 4 years
$12,000.00 and up - 5 years
After the Branch sets an exemption period, a landlord may find that they must do more work than originally planned. If this happens, the landlord can apply to the Branch to extend the exemption period.
Suffice to say, we all feel pretty vulnerable right now and plenty unsure of what the next few weeks will bring. So far only 3 tenants have received notice, but no one else has, so we can only speculate what's to come.
In the meantime we will keep trying to figure out what action to take with both the appeal to the rent increase and now preparing to appeal the rehabilitation scheme should it be approved.
We all feel it is important to share the knowledge, and hopefully there will be some of you who may even be able to offer some help.
If you have thoughts or ideas please email 43roslyn (at) gmail.com
2. They have already given notice to three tenants in the building that they will be terminating their leases July 31st. (These tenants were given 90 days notice prior to their lease renewal date.)
Here are scans of the 3-page notice give to one of those tenants.
Click on the image to enlarge:



3. We have been told by property manager, Candace Bertie, that
- Everyone can expect this notice 3 months (90 days) prior to their lease expiring.
- If the application is approved, the proposed period of renovations would being June 1 and carry on until the end of October, November.
- New rents will be approx $850 for a 1 BR $1000 for a 2 BR.
4. Some things you need to know about what can happen after a rehabilitation scheme:
- A tenant who was previously living in a complex before a rehabilitation scheme is technically supposed to have the first chance to move back in. (see the points below...)
- New rents will be beyond scope of rent control for next FIVE years. In other words, you can come back to your apartment @ 850/month and then have it jacked up another 50, 75 or more dollars in subsequent years.
- the WHOLE building is affected, every suite has to have renovations as part of the rehab scheme criteria.
- Shindico may not charge the new rent until ALL renovations are completed and meet up to the expectations of the Residential Tenancies Branch. (There is a final inspection for this, and tenants can delay the new rent process is the renovations/repairs have not met the proposed plan.)
5. The official words from the RTB policies and guidelines:
- Within 14 days of applying for approval of their rehabilitation scheme, the landlord must give the tenants affected by the scheme written notice of their plans. The landlord must also give the tenants a chance to inspect the application and the supporting information.
- If the tenants must move out to allow the landlord to do the work, the landlord must give them a written notice to end the tenancy. The landlord must pay the tenant’s moving expenses up to $350.00.
- Tenants who lived in a residential complex, before the rehabilitation scheme, must be given the first chance to move back in. The landlord must charge the returning tenant the lowest rent they would charge any other tenant for the same unit.
- If a plan is approved, the rental unit(s) or complex can be exempt from the annual rent increase guideline for up to five years. The landlord is still required to give the tenants three months’ notice of any rent increase. The landlord is also required to give a Notice to New Tenant form to any tenant moving into the building.
To set an exemption period, the Branch calculates how much the landlord plans to spend on each unit. The Branch then uses the following scale:
Cost Per Unit Exemption Period
$ 6,000.00 – $7,999.99 - 2 years
$ 8,000.00 – $9,999.99 - 3 years
$10,000.00 – $11,999.99 - 4 years
$12,000.00 and up - 5 years
After the Branch sets an exemption period, a landlord may find that they must do more work than originally planned. If this happens, the landlord can apply to the Branch to extend the exemption period.
Suffice to say, we all feel pretty vulnerable right now and plenty unsure of what the next few weeks will bring. So far only 3 tenants have received notice, but no one else has, so we can only speculate what's to come.
In the meantime we will keep trying to figure out what action to take with both the appeal to the rent increase and now preparing to appeal the rehabilitation scheme should it be approved.
We all feel it is important to share the knowledge, and hopefully there will be some of you who may even be able to offer some help.
If you have thoughts or ideas please email 43roslyn (at) gmail.com
Labels:
eviction,
notice,
rehabilitation scheme,
termination
Friday, May 8, 2009
Explanation of Suite Inspections
Last week, we tried to find out why the RTB and Shinidco were inspecting suites. When questioned, the RTB insisted that there was no officer sent and no record of any inspection.
It was not until today that an Residential Tenancies Branch officer finally was able to provide an explanation for the inspection:
Apparently, the suite inspection that occurred the morning of Friday, May 1st, was not in regards to the appeal or the rehabilitation scheme application.
An Residential Tenancies Branch Repair officer was scheduled to meet with the group for a repair issue; the RTB was asked for guidance on whether certain areas were up to code.
It was not until today that an Residential Tenancies Branch officer finally was able to provide an explanation for the inspection:
Apparently, the suite inspection that occurred the morning of Friday, May 1st, was not in regards to the appeal or the rehabilitation scheme application.
An Residential Tenancies Branch Repair officer was scheduled to meet with the group for a repair issue; the RTB was asked for guidance on whether certain areas were up to code.
With the termination notices being handed out the night before, we can only surmise that this was part of the plan in initiating the rehabilitation scheme application and having a representative of the RTB visit to confirm costs for repair, etc.
Friday, May 1, 2009
Notice given to 3 tenants
Late last night, one of the tenants in our building was given an eviction notice.
Based on some documentation to be signed by the tenants receiving this notice, we believe that 2 other tenants with the lease renewal date of August 1st, were also being asked to vacate by July 31st.
Based on some documentation to be signed by the tenants receiving this notice, we believe that 2 other tenants with the lease renewal date of August 1st, were also being asked to vacate by July 31st.
Labels:
eviction,
notice,
rehabilitation scheme,
termination
Friday, April 24, 2009
Reminder: APPEAL BEFORE MONDAY
IF you haven't already, it is important that you APPEAL before the deadline on Monday, April 27, 2009. (That's NEXT monday.)
You will have received a letter in the mail with the ORDER from the Residential Tenancies Branch that they have approved the increase. That letter would start out with this information:

All you have to do is:
IF you cannot make it in person, the other option is to MAIL IT IN before Monday (if it's postmarked April 27th or before, it should still be accepted.)
Send it in to:
Residential Tenancies Commission
1650 - 155 Carlton St.
Winnipeg, MB
R3C 3H8)
Again, it's not necessary to write a letter with any particular details at this point.
The only thing you need to do is send in or fill out the form at the Residential Tenancies Commission. Again, for not very much of your time, you could be saving yourself a very significant amount of money paid in rent.
If you have questions, please email 43roslyn (at) gmail.com.
View Larger Map
You will have received a letter in the mail with the ORDER from the Residential Tenancies Branch that they have approved the increase. That letter would start out with this information:

All you have to do is:
- Bring the ORDER you have been sent with you. You don't have to have a letter or any list of reasons just the Order so they can take a copy.
- Go to 155 Carlton St. - it's at the corner of York and Carlton... If you know where Shannon's Pub is it's on the same block, just closer to us.
- Go to suite 1650 - it's on the 16th floor.
- There, let the front desk know you wish to file an appeal. They will give you a form to fill out at the desk, which involves putting down Shindico's address and details, and your address and details. It takes 5 MINUTES.

IF you cannot make it in person, the other option is to MAIL IT IN before Monday (if it's postmarked April 27th or before, it should still be accepted.)
- your name & address
- the RTB order #
- and a photocopy of the RTB order
Send it in to:
Residential Tenancies Commission
1650 - 155 Carlton St.
Winnipeg, MB
R3C 3H8)
Again, it's not necessary to write a letter with any particular details at this point.
The only thing you need to do is send in or fill out the form at the Residential Tenancies Commission. Again, for not very much of your time, you could be saving yourself a very significant amount of money paid in rent.
If you have questions, please email 43roslyn (at) gmail.com.
View Larger Map
Follow up email from Jennifer Howard
An email from Jennifer Howard addressing the issues raised on Monday's meeting:
Hi all -
It was a pleasure meeting with all of you on Monday. I wanted to provide you with the information that you had requested. Here are the questions you had asked me and the responses that I have been able to find:
1) What is the regulation with regards to applying for a rent increase to cover the costs of repairs made necessary by past neglect of general maintenance? Is there any definition of "regular maintenance"?
There isn't an actual definition of "regular maintenance" in either the Act or the regulations. The regulation states that a landlord's operating expenses can include the cost of renting, maintaining and repairing, facilities, equipment, furnishings and furniture to the extent that the costs have not been recovered from a tenant's security deposit or form another source. All of these expenses must be related to the normal or usual operation of the residential complex and must not be non-recurring or extraordinary expenses.
The Act provides that the director must consider whether and to what extent any increases in costs with respect to repairs and maintenance result from inadequate maintenance in previous years if the residential complex was sold in the last three years.
2) What is the rule about landlords applying the rent increase before it is approved? Can a landlord apply the increase before it is approved? At what point can the increase be applied?
Landlords who give the required three months written notice of a rent increase can begin collecting the proposed rent increase on the effective date of the rent increase even if the rent increase approval process is not completed by either the Residential Tenancies Branch or Commission on appeal. If the requested rent increase is not approved and the landlord has already collected it, the landlord is required to refund the tenants for any overpayments.
3) Is there a tenant officer that has this file with whom the tenants may speak and get more technical information?
The name of the officer who issued the Order is on the Order. If tenants require information that is not included in the Reasons for Decision they may contact this officer directly. His name is Rosaire Lemoine and he can be reached at 945-5722.
4) Is there a public document that lists the types of repairs that are eligible for an above guideline increase and the amortization period for each?
The entire rent regulation is at this web address http://web2.gov.mb.ca/laws/regs/pdf/r119-156.92.pdf
The specific regulations that deal with expenses are Regulation 8 (operating) and regulation 9 (capital).
I recognize that several of the concerns raised are more of a policy nature. Please be assured that I will be raising these issues with my colleagues, including the Minister.
Thanks for sharing your concerns with me. Please don't hesitate to contact me or my office if you require anything else. And please keep me informed on the status of your appeal.
Take care,
Jennifer
---------------------------------------------------------------------
Jennifer Howard
MLA for Fort Rouge
Constituency Office: 946-0272
Legislature Office: 945-3981
jennifer.howard (at) leg.gov.mb.ca
Hi all -
It was a pleasure meeting with all of you on Monday. I wanted to provide you with the information that you had requested. Here are the questions you had asked me and the responses that I have been able to find:
1) What is the regulation with regards to applying for a rent increase to cover the costs of repairs made necessary by past neglect of general maintenance? Is there any definition of "regular maintenance"?
There isn't an actual definition of "regular maintenance" in either the Act or the regulations. The regulation states that a landlord's operating expenses can include the cost of renting, maintaining and repairing, facilities, equipment, furnishings and furniture to the extent that the costs have not been recovered from a tenant's security deposit or form another source. All of these expenses must be related to the normal or usual operation of the residential complex and must not be non-recurring or extraordinary expenses.
The Act provides that the director must consider whether and to what extent any increases in costs with respect to repairs and maintenance result from inadequate maintenance in previous years if the residential complex was sold in the last three years.
2) What is the rule about landlords applying the rent increase before it is approved? Can a landlord apply the increase before it is approved? At what point can the increase be applied?
Landlords who give the required three months written notice of a rent increase can begin collecting the proposed rent increase on the effective date of the rent increase even if the rent increase approval process is not completed by either the Residential Tenancies Branch or Commission on appeal. If the requested rent increase is not approved and the landlord has already collected it, the landlord is required to refund the tenants for any overpayments.
3) Is there a tenant officer that has this file with whom the tenants may speak and get more technical information?
The name of the officer who issued the Order is on the Order. If tenants require information that is not included in the Reasons for Decision they may contact this officer directly. His name is Rosaire Lemoine and he can be reached at 945-5722.
4) Is there a public document that lists the types of repairs that are eligible for an above guideline increase and the amortization period for each?
The entire rent regulation is at this web address http://web2.gov.mb.ca/laws/regs/pdf/r119-156.92.pdf
The specific regulations that deal with expenses are Regulation 8 (operating) and regulation 9 (capital).
I recognize that several of the concerns raised are more of a policy nature. Please be assured that I will be raising these issues with my colleagues, including the Minister.
Thanks for sharing your concerns with me. Please don't hesitate to contact me or my office if you require anything else. And please keep me informed on the status of your appeal.
Take care,
Jennifer
---------------------------------------------------------------------
Jennifer Howard
MLA for Fort Rouge
Constituency Office: 946-0272
Legislature Office: 945-3981
jennifer.howard (at) leg.gov.mb.ca
Thursday, April 23, 2009
Recap: Meeting with Jennifer Howard
Several tenants were able to attend a meeting wit our MLA, Jennifer Howard, this past Monday evening.
The meeting was more in regards to policies and legislation and examining the process of appeal for tenants in general.
Ms. Howard was gracious with her time, and listened to each of us in attendance, but was clear that she was not really able to provide the resources and information for our immediate situation - the appeal process.
Still, some very important information was shared between tenants in attendance and also with our MLA.
On the topic of tenants’ rights and the appeal process:
On the topic of policy and regulation:
Addressing these issues, investigating the “Advisory Board” and writing our thoughts and experiences with the process and sending them to Ms. Howard is something that several of the tenants are interested in pursuing in the long term.
In regards to our appeal, this is still something we are looking for help in building a united “case” for the hearing.
This is something most of us wish to address as it’s pending and time is of the essence.
The key thing is to appeal first.
The meeting was more in regards to policies and legislation and examining the process of appeal for tenants in general.
Ms. Howard was gracious with her time, and listened to each of us in attendance, but was clear that she was not really able to provide the resources and information for our immediate situation - the appeal process.
Still, some very important information was shared between tenants in attendance and also with our MLA.
On the topic of tenants’ rights and the appeal process:
- We discussed the difficulties and how little influence a tenant has during the appeal process.
- the issue of how tenants are allowed to access information – timelines for accessing documents being short and difficult, the inability to copy the documents to bring to outside assistance (lawyers, forensic accountants), and the timeline to appeal.
- the lack of access to resources and advocacy support that would allow tenants to approach the parties at a hearing with a solid case and appropriate arguments.
- we needed to understand what constituted “regular maintenance” and what could be claimed as “major repairs” to identify what exactly the landlord was attempt to recover costs for.
On the topic of policy and regulation:
- Ms. Howard spoke about the history behind the Residential Tenancies act, rent regulation and how they came about in response to inflation.
- These regulations were put in place to discourage landlords from dropping buildings and property that they felt were too expensive to maintain or keep. By allowing the application for increase above a guideline, they could find a way to recover costs in fixing up & keeping building in decent repair. This is meant to balance landlords costs to keep their buildings in good repair and reasonable rents for tenants.
- A residential advisory board made up of appointed representatives (landlords & tenants) is set to oversee and approve changes to these regulations...
- A regular avg increase in rent (below the guideline) usually does not cover larger repairs. 65% of tenants pay the avg guideline, 35% pay the increase.
- Affordability is another issue altogether from this.
Addressing these issues, investigating the “Advisory Board” and writing our thoughts and experiences with the process and sending them to Ms. Howard is something that several of the tenants are interested in pursuing in the long term.
In regards to our appeal, this is still something we are looking for help in building a united “case” for the hearing.
This is something most of us wish to address as it’s pending and time is of the essence.
The key thing is to appeal first.
Monday, April 20, 2009
Reminder: tonight's meeting with Jennifer Howard
1. Use the BROADWAY entrance of the Legislature (that is the *front*, so to speak). All other entries will be locked.
2. Check in with Security inside the front entrance, who may ask us to sign in & if anyone drove/parked in visitor's parking -- Security will ask for your license plate number.
3. Go upstairs to room 234 on the 2nd floor (using either the staircase or elevator)
If you're looking to walk over with someone, a small group will leave @ approx. 6:40 pm -- meetup in front of our building at that time.
Considering we'll have only about an hour with our MLA, perhaps we can ponder some of the questions we have for Jennifer Howard -- as well as any key points we'd like to make.
A few points to address?
- Given the fact she and other MLA's are very much *aware* of this situation as it currently stands (i.e. v. low vacancy rates, unwarranted rent hikes in massive quantities, and that current regulation/policies actually CONTRIBUTE to these problems) -- given these givens -- Just what is/will be DONE about it?
- What are the challenges/obstacles to effecting this change?
- What can we do to help our current situation?
Please keep in mind the point of the meeting is to gather more info on how to approach this appeal and what resources we may have access to.
2. Check in with Security inside the front entrance, who may ask us to sign in & if anyone drove/parked in visitor's parking -- Security will ask for your license plate number.
3. Go upstairs to room 234 on the 2nd floor (using either the staircase or elevator)
If you're looking to walk over with someone, a small group will leave @ approx. 6:40 pm -- meetup in front of our building at that time.
Considering we'll have only about an hour with our MLA, perhaps we can ponder some of the questions we have for Jennifer Howard -- as well as any key points we'd like to make.
A few points to address?
- Given the fact she and other MLA's are very much *aware* of this situation as it currently stands (i.e. v. low vacancy rates, unwarranted rent hikes in massive quantities, and that current regulation/policies actually CONTRIBUTE to these problems) -- given these givens -- Just what is/will be DONE about it?
- What are the challenges/obstacles to effecting this change?
- What can we do to help our current situation?
Please keep in mind the point of the meeting is to gather more info on how to approach this appeal and what resources we may have access to.
Friday, April 17, 2009
CONFIRMATION of MEETING
The meeting with Jennifer Howard is all set up for 7pm at the Legislature on April 20 (Monday). The meeting will take place in room 234 on the 2nd floor. All meeting attendees need to use the Broadway entrance and check in with Security. From there we can either go up the large staircase or take the elevators to the right to the 2nd floor and proceed down the hallway to the South side of the building. If we have questions, we can ask Security to explain it for us.
NOTE: We'll need to give all meeting attendees' names to security in advance. If interested, please email 43roslyn@gmail.com by NOON Monday, 20 April.
Labels:
appeal process,
rent increase,
tenants meeting
Meeting with Jennifer Howard next week & the appeal process
We have the date for the meeting with Jennifer Howard, this coming Monday, 20 April @ 7pm. (the time still needs to be confirmed). It'll take place at her office at the Legislature. Check back for confirmation and address.
-=-=-
Regarding the appeal process with the Residential Tenancies Commission, there are two ways to appeal:
1. Going to their offices at 155 Carlton St. (suite 1650) and filing an appeal in person.
2. Mailing their office (1650 - 155 Carlton St. R3C 3H8) with the following information:
> Your Name & Address
> RTB order #
> Photocopy of the RTB order
*** NOTE *** it's not necessary to write a letter with any particular details at this point. The only thing you need are the items above: i.e. who you are, where you are & copy of RTB order.
The deadline is Monday, 27 April -- and if it's postmarked by that date it will be accepted as on time.
About the RTC's appeal process:
1. They open the file and assign an appeal officer. Apparently this officer will be an accessible point person for us, tenants. We will be able to discuss & ask questions of this individual.
2. Appeal Officer reviews all the previous documents/files associated with this case (obtained from the RTB).
3. A hearing date is set, generally within a month or so of the file opening. Tenants will recieve approximately 3 weeks notice for this hearing.
4. We will receive a *scheduled time* (approx. 2 weeks prior to hearing) to come view the file documents. By the sounds of it, this is a specific day/time that, if not convenient for certain tenants, they will be able to reschedule.
5. We attend the hearing and present our case.
Keep checking back for more information.
We will have an email for you to contact for more questions, but please read through the info here on this site first.
Thanks.
-=-=-
Regarding the appeal process with the Residential Tenancies Commission, there are two ways to appeal:
1. Going to their offices at 155 Carlton St. (suite 1650) and filing an appeal in person.
2. Mailing their office (1650 - 155 Carlton St. R3C 3H8) with the following information:
> Your Name & Address
> RTB order #
> Photocopy of the RTB order
*** NOTE *** it's not necessary to write a letter with any particular details at this point. The only thing you need are the items above: i.e. who you are, where you are & copy of RTB order.
The deadline is Monday, 27 April -- and if it's postmarked by that date it will be accepted as on time.
About the RTC's appeal process:
1. They open the file and assign an appeal officer. Apparently this officer will be an accessible point person for us, tenants. We will be able to discuss & ask questions of this individual.
2. Appeal Officer reviews all the previous documents/files associated with this case (obtained from the RTB).
3. A hearing date is set, generally within a month or so of the file opening. Tenants will recieve approximately 3 weeks notice for this hearing.
4. We will receive a *scheduled time* (approx. 2 weeks prior to hearing) to come view the file documents. By the sounds of it, this is a specific day/time that, if not convenient for certain tenants, they will be able to reschedule.
5. We attend the hearing and present our case.
Keep checking back for more information.
We will have an email for you to contact for more questions, but please read through the info here on this site first.
Thanks.
Sunday, April 12, 2009
Order for the increase has been approved
The order from the RTB is in with the 8% increase approved. (Tenant's should have received a letter last week.)
It is now time to get moving towards the appeal. The appeal with the RTC is an entirely new process -- separate from whatever happened with the RTB.
The important thing is that as many tenants as possible actually FILE THE APPEAL. That and gathering the evidence (i.e. photos, info on apartment disrepair via questionnaires, etc.) is what needs to happen now.
The letter states you need to apply to the Residential Tenancies Commission* (1650-155 Carlton St, Winnipeg MB R3C 3H8) IN PERSON or by mail no later than Monday, April 27, 2009. Bring with you a copy of the order.
*The RTC is not the same as the Residential Tenancies Branch.
More information about the RTC can be found here: http://www.ppmamanitoba.com/articles/a0000018.html
** It is HIGHLY recommended that you apply in person - it removes any doubt that the appeal has been filed.
Information about the Above the Guideline Rent Increases
It is now time to get moving towards the appeal. The appeal with the RTC is an entirely new process -- separate from whatever happened with the RTB.
The important thing is that as many tenants as possible actually FILE THE APPEAL. That and gathering the evidence (i.e. photos, info on apartment disrepair via questionnaires, etc.) is what needs to happen now.
The letter states you need to apply to the Residential Tenancies Commission* (1650-155 Carlton St, Winnipeg MB R3C 3H8) IN PERSON or by mail no later than Monday, April 27, 2009. Bring with you a copy of the order.
*The RTC is not the same as the Residential Tenancies Branch.
More information about the RTC can be found here: http://www.ppmamanitoba.com/articles/a0000018.html
** It is HIGHLY recommended that you apply in person - it removes any doubt that the appeal has been filed.
Information about the Above the Guideline Rent Increases
Subscribe to: